The park
Training park in authentic environment for cable pulling and fiber blowing
Training park in authentic environment for cable pulling and fiber blowing
In Holsljunga is Sweden’s latest training park in an authentic environment for underground cable laying, overhead line construction and fiber blowing. It was inaugurated in the autumn of 2021 and is an investment with many winners as it benefits users, retailers, product developers and ultimately the entire electricity network industry.
In the Park, which extends in nature around the factory, a training course with overhead line containing both straight and angular distances is offered. Furthermore, there is a section for underground cable pulling in different dimensions, as well as an “opto” section with a number of different types of hose ducting. Through practical exercises, the Park will offer opportunities for increased knowledge of performances, working methods, tools and machines used in construction and service in the cable network.
– The park revitalizes Sahlins as a company, but not least it is an investment that will benefit all users in the industry and the quality of all installation work, says CEO Mattis Svensson
As a complement to the practice course, there is also a new conference room close to the Park where industry-related theoretical training is arranged.
– Here, theoretical knowledge of methods, tools and machines is mixed with the possibility of testing these in a real environment. An unbeatable combination. The fact that manufacturing and development are in the same place also creates good exchanges between users and product developers.
Course | Underground cable pulling | Overhead cable pulling | Fiber blowing |
---|---|---|---|
Stations | A1: Start and drum handling A2: Angular passage with cable feeder A3: End station with pulling unit | C1: Start and drum handling C2: End station with pulling unit | B1: Start B2: Manhole B3: End station |
Length | 135 m | 100 m | 270 m |
Desciption | Cable pulling with angled passage through duct (Ø100, Ø110, Ø160) and open ditch. | Overhead line pulling through seven poles, of which angular passage 2 x 40 ° | Fiber blowing in duct (Ø50, Ø40, Ø14 & multi duct) through several angles. |
Stations
A1: Start and drum handling
A2: Angular passage with cable feeder
A3: End station with cable winch
Length
135 m
Description
Cable pulling through angular passage in duct (Ø100, Ø110, Ø160) and open ditch.
Do not hesitate to contact us with any questions regarding the Park and its offer. Call us or send an e-mail – we will get back to you shortly.